SMALL HOMES. MORE POSSIBILITIES.

Room for one more.

Search a parcel. Test an ADU or shed footprint. Compare current rules.

Start with the space.
Compare mapped space with the rules that affect it.

Mapped space • current zoning not applied

Selected parcelExisting structureTest footprint
Parcel outlines: 2021 · Building footprints: 2022
Mapping the possibilitiesLoading East Providence parcels…

5 ft from lot lines and mapped structures. Front-yard setbacks and other approvals need review.

TEST A RULE CHANGE

What changes if we change the rules?

HYPOTHETICAL SCENARIO

Loading geometry scenarios…

WardBase space candidatesTest scenarioChange

Uniform test distances, not parcel zoning. Mapped-structure clearance stays at 5 ft. Coverage uses mapped structures plus one new footprint. Frontage, access and other requirements remain unverified.

What could this add up to?

One new home on a share of candidate parcels. Compare the four wards.

—

candidate parcels

—

additional homes at 5%

—

construction investment

500 sq ft ADU

$150,000 per completed unit

Updates with the footprint above
WardResidential lots mappedCandidate parcelsAdditional homesConstruction investment

Where the lot-size rule matters

Candidate parcels with a sampled footprint fit, grouped by recorded lot area.

WardSpace foundBelow 5,000 sq ft5,000 sq ft or more

East Providence’s standard new-detached route has a 5,000 sq ft minimum. Barrington has no ADU-specific lot minimum; accessory-structure standards still apply. Barrington code ↗

This isolates the lot-size screen. It is not a count of approved or legally buildable ADUs. Conversions and accommodation routes need separate review.

Candidates have a mapped existing structure and at least one sampled placement. Counts are preliminary and depend on the footprint. Results do not establish that other parcels cannot fit an ADU.